[1]
Schneider, V.A. et al. 2021. Study of the process of cylindrical road isothermal tanks aimed at improvement actions through Lean Manufacturing and value flow map.
Exacta
. 19, 1 (Mar. 2021), 35–51. DOI:https://doi.org/10.5585/exactaep.v19n1.8940.