Integration of Project Management with the Proposed Stage-Gate: The Tuning Project Case Report

Authors

  • Michelle de Stefano Sabino Anhanguera Educacional
  • Cássio Chagas Montenegro Duarte Companhia de Processamento de Dados do Estado de São Paulo - PRODESP, São Paulo

DOI:

https://doi.org/10.5585/gep.v2i2.53

Keywords:

Projects Management, Stage-Gate®, Integration of Processes

Abstract

This paper aims to describe and to analyze the integration observed in the Sintonia project with respect to the comparison of project management processes to the model of the Stage-Gate ®. The literature addresses these issues conceptually, but lack an alignment between them that is evident in practice. As a method was used single case study. The report is as if the Sintonia project, developed by PRODESP - Data Processing Company of São Paulo. The results show the integration of project management processes with the Stage-Gate model developed during the project life cycle. The formalization of the project was defined in stages in which allowed the exploitation of economies of repetition and recombination to the development of new projects. This study contributes to the technical vision in dealing with the integration of project management processes. It was concluded that this system represents an attractive way, in terms of creating economic value and technological innovation for the organization.

Author Biographies

Michelle de Stefano Sabino, Anhanguera Educacional

Mestranda do Mestrado Profissional em Administração - Gestão de Projetos Professora da Anhanguera Educacional

Cássio Chagas Montenegro Duarte, Companhia de Processamento de Dados do Estado de São Paulo - PRODESP, São Paulo

Mestrando do Mestrado Profissional em Administração - Gestão de Projetos - UNINOVE. Possui graduação em Tecnologia em Processamento de Dados, pela Universidade Presbiteriana Mackenzie (1989) , graduação em Engenharia Elétrica pela Pontifícia Universidade Católica de São Paulo (1999) e especialização em Gestão de Tecnologia da Informação pela Faculdade de Informática e Administração Paulista (2006) . Atualmente é Especialista de Informática da Companhia de Processamento de Dados do Estado de São Paulo. 23/09/09

References

Cooper, R.G. Perspective: The Stage-Gate Idea-to-Launch Process-Update, What's New, and NexGen Systems. Product Innovation Management. Product Development & Management Association, 2008.

Eisenhardt, K. M. Building theories from case study research. Academy of Management Review, 1989.

Jacobson, I.; Booch, G.; Rumbaugh, J. The Unified Software Development Process. Upper Saddle River, NJ: Addison Wesley, 1999.

Pmi. A Guide to the Project Management Body of Knowledge (PMBok Guide) Third Edition. Pennsylvania: Project Management Institute, Inc, 2004.

Pmi. A Guide to the Project Management Body of Knowledge (PMBok Guide) Fourth Edition. Pennsylvania: Project Management Institute, Inc, 2008.

Poupatempo. O que é Poupatempo? Recuperado em 10 dezembro, 2010, de http://www.poupatempo.sp.gov.br/oqueeopoupa/index.asp

Prodesp. Companhia de Processamento de Dados do Estado de São Paulo. Informações Econômico-Financeiras. Recuperado em 10 dezembro, 2010, de http://www.prodesp.sp.gov.br/

Sintonia®. (2009). (Versão 1.0) [Software]. Taboão da Serra, SP: Companhia de Processamento de Dados do Estado de São Paulo.

Yin, R. Applications of case study research. Newbury Park, California: Sage Publishing, 1993.

Yin, R. Estudo de caso – planejamento e métodos. Porto Alegre: Bookman. 2001.

Published

2011-12-28

How to Cite

Sabino, M. de S., & Montenegro Duarte, C. C. (2011). Integration of Project Management with the Proposed Stage-Gate: The Tuning Project Case Report. Revista De Gestão E Projetos, 2(2), 184–213. https://doi.org/10.5585/gep.v2i2.53

Issue

Section

Technical Reports