Correlation between Engagement Level of Project Teams and Performance in a Public Company by Structured Projects

Authors

  • Flávio Lima Constâncio Universidade Católica de Brasília
  • João Souza Neto Universidade Católica de Brasília

DOI:

https://doi.org/10.5585/gep.v7i2.340

Keywords:

Stakeholder Engagement. Project Performance.

Abstract

Studies claim that to have the stakeholders of a project engaged directly reflect on its success. This study aimed to evaluate the correlation between the level of stakeholder engagement (project members) and project performance. In order to achieve this goal, a questionnaire was applied to measure the level of stakeholder engagement in projects of a research institution structured by projects and the correlation with the performance index of the projects, generated from data extracted from project management of the institution's projects, was evaluated. The findings showed, for the research institution, that there is no direct relation between the level of stakeholder engagement and project performance.

Author Biographies

Flávio Lima Constâncio, Universidade Católica de Brasília

Mestrando em Gestão do Conhecimento e Tecnologia da Informação da Universidade Católica de Brasília – UCB. Brasil. 

 

João Souza Neto, Universidade Católica de Brasília

Doutor em Engenharia Elétrica pela UNB. Mestre em Engenharia Eletrônica pelo Philips International Institute da Holanda. É Professor do Mestrado em Gestão do Conhecimento e Tecnologia da Informação da Universidade Católica de Brasília. É certificado CGEIT – Certified in the Governance of Enterprise IT, CRISC – Certified in Risk and Information Systems Control e Certified COBIT Assessor #14. É Instrutor Credenciado de COBIT 5 pela APMG. É Diretor e membro fundador do Capítulo Brasília da ISACA.

References

Abboubi, M., & Cornet, A. (2012). Towards a Dynamic Stakeholder Management framework for CSR Certifications. International Journal Of Business And Social Science, 1-12.

Aladwani, A. M. (2002). An Integrated Performance Model Information Systems Projects. Journal Of Management Information Systems, 185-210.

Barboza Filho, F. U. N,, Carvalho, M. M., & Ramos, A. W. (2009). Gerenciamento de projetos: o impacto do uso dos indicadores de desempenho no resultado do projeto. Produto & Produção, 38-53.

Belout, A., & Gauvreau, C. (2004). Factors influencing project success: the impact of human resource management. International Journal of Project Management, 1-11.

Beware. (10 de maio de 2015). 607 Indicadores Chave de Performance. Fonte: BEWARE: http://beware.com.br/arquivos/indicadores-chave-de-desempenho-KPI-Gerenciamento-de-Projetos-Programas-e-Portfolio.pdf

Carvalho, M. M., & Junior, R. R. (2005). Construindo Competências para Gerenciar Projetos: Teorias e Casos. São Paulo: Atlas.

Dantas, Fernando Santos. Situação Das Organizações Quanto Ao Uso Do Portfólio De Projetos Como Mecanismo De Promoção Do Alinhamento Com A Estratégia. 2013. 150 f. Dissertação (Mestrado) - Curso de Gestão do Conhecimento e Tecnologia da Informação, Universidade Católica de Brasília, Brasilia, 2013.

De Wit, A. (1988). Measurement of Project Success. Journal of Project Management.

Dinsmore, P. C., & Cabannis-Brewin, J. (2009). Manual de gerenciamento de projetos. Rio de Janeiro: Brasport.

Ferreira, H., Cassiolato, M., & Gonzalez, R. (2009). Uma experiência de desenvolvimento metodológico para avaliação de programas: o modelo lógico do programa segundo tempo. Rio de Janeiro: Ipea.

Freeman, R. Edward.. Strategic management: A stakeholder approach. Cambridge: Cambridge University Press, 2010.

Gao, S. S., & Zhang, J. J. (2006). Stakeholder engagement, social auditing and corporate sustainability. Business Process Management Journal, 722-740.

Henderson, J. C., & Lee, S. (1992). Managing I/S design teams: a control theories perspective. Management Science, 757-777.

Jones, T. M.; Wicks, A. C; Freeman, R. E. Stakeholder theory: the state of the art. In The Blackwell Guide to Business Ethics, Bowie NE (ed). Blackwell Publishers: Oxford; 19–37. 2002.

Luu, V T., Kim, S., & Huynh, T. (2008). Improving project management performance of large contractors using benchmarking approach. International Journal Of Project Management. 758-769.

Muscat, R. N., & Fleury, A. C. C. (2000). Indicadores da Qualidade e Produtividade na Indústria Brasileira. Revista Indicadores da Qualidade e Produtividade.

Peterson, H. C. (2013). Fundamental Principles of Managing Multi-stakeholder Engagement. International Food And Agribusiness Management Review.

PMI. (2003). PMBoK: The Standard for Program Management. Pennsylvanua: Project Management Institute.

Qureshi, T. M., Warraich, A. S., & HijazI, S. T. (2009). Significance of project management performance assessment (PMPA) model. International Journal Of Project Management, 378-388.

Robey, D., Smith, L. A., & Vijayasarathy, L. R. (1993). Perception of conflict and success in information systems development projects. Journal Of Management Information Systems, 123-139.

Savage, G.t. et al. Strategies for assessing and managing organisational stakeholders. Academy Of Management Executive, v. 5, n. 2, p.61-75, 1991.

Schaufeli, W. B., Bakker, A. B., & Salanova, M. (2006). The Measurement of Work Engagement With a Short Questionnaire A Cross-National Study. Sage, 701-716.

Shenhar, A. J. (2004). Strategic Project Leadership. Toward a strategic approach to project management. R&d Management, 569-578.

Shimakura, S. (15 de ago de 2015). Bioestatística avançada I. Fonte: UFPR: http://leg.ufpr.br/~silvia/CE701/ce701.html

Smith, N. C., Ansett, S., & Erez, L. (2011). How Gap Inc. engaged with its stakeholders. Mit Sloan Management Review, 69-76.

Terribili Filho, A. (15 de fev de 2015). A escolha dos indicadores de desempenho. Fonte: Artigonal: http://www.artigonal.com/ger-de-projetos-artigos/a-escolha-dos-indicadores-de-desempenho-dos-projeto

Walker, D. H. T., & Rowlinson, S. (2008). Procurement Systems: A cross-industry project management perspective. London And New York: Taylor & Francis Group.

Wefald, A. J., Mills, M. J., Smith, M. R., & Downey, R. G. (2012). A Comparison of Three Job Engagement Measures: Examining their Factorial and Criterion-Related Validity. The International Association Of Applied Psychology, 67-90.

Yang, J., Shen, G. Q., Ho, M., Drew, D. S., & Xue, X. (2011). Stakeholder management in construction: An empirical study to address research gaps in previous studies. International Journal Of Project Management 900-910.

Published

2016-08-30

How to Cite

Constâncio, F. L., & Neto, J. S. (2016). Correlation between Engagement Level of Project Teams and Performance in a Public Company by Structured Projects. Revista De Gestão E Projetos, 7(2), 16–33. https://doi.org/10.5585/gep.v7i2.340

Issue

Section

Articles