Benefits of the application of the SMED methodology for the reduction of setup time in machinery manufacturing cells
DOI:
https://doi.org/10.5585/exactaep.v19n1.10828Keywords:
Machining, setup, SMED e DMAICAbstract
Currently companies need to remain competitive in the market, so it is necessary to implement methods to obtain process improvements and cost reduction. In the productive environment, one of the main causes of increased waste is the setup, and one of the methodologies used is SMED (Single Minute Exchange of Die), which can reduce setup time. In this context, the work presents an improvement in the reduction of setup time in the machining process in a company in the auto parts sector, based on the concepts of the SMED methodology aiming at the use of separation techniques, reduction of setup time, standardization of activities and process improvements. The methodology used for the development of the study was based on an explanatory research of the research-action type correlated to the use of the DMAIC method. With the improvements implemented, the reduction of setup time and increased availability were achieved.
Downloads
References
Allahverdi, A. & Soroush, H. M. (2008). The significance of reducing setup times/setup costs. European Journal of Operations Research, 187, 978-984.
Batelochi, L. (2007). Fundamento do set up rápido. Revista O mundo da Usinagem, 38, 8, 6-11.
Boran, S. & Ekincioğlu, C. (2017). A novel integrated SMED approach for reducing setup time. The International Journal of Advanced Manufacturing Technology, 92, 3941–3951.
Braglia, M., Frosolini, M. & Gallo, M. (2016). SMED enhanced with 5-Whys Analysis to improve set-up reduction programs: the SWAN approach. International Journal of Advanced Manufacturing Technology, 1–11.
Calhado, M. P., France, L.D.A., Rocha, Y.B., Oliveira, F.M.V.B. & Oliveira Neto, P.C. (2015, outubro). Implantação do método de troca rápida de ferramentas no setor de usinagem em uma indústria de autopeças. Anais do Encontro Nacional de Engenharia de Produção, Fortaleza, CE, Brasil, 35.
Castro, C. M. (1976). Estrutura e apresentação de publicações científicas. São Paulo: McGraw-Hill.
Cakmakci, M. & Karasu, M. K. (2007). Set-up time reduction process and integrated predetermined time system MTM-UAS: a study of application in a large size company of automobile industry. The International Journal of Advanced Manufacturing Technology, 33, 3, 334-344.
Cechect, I. A., Kainin, J. I., Costa, C. A. & Luciano, M.A. (2008, novembro). Implantação dos conceitos de TRF em uma empresa do setor de plásticos. Anais do Simposio de Engenharia de Produção, Bauru, SP, Brasil.
Corazza, E. J. (2016, outubro). Otimização do tempo de setup no setor de usinagem, em uma empresa de processamento de alumínio de Joinville/SC – Brasil. Anais do Encontro Nacional de Engenharia de Produção. João Pessoa, PB, Brasil, 36.
Elliot, J. (1997). La investigación-acción en educación (3a ed.) Madrid: Morata.
Fonseca, J. J. S. (2002). Metodologia da pesquisa científica. Fortaleza: UEC..
Fogliatto, F. S. & Fagundes, P. R. M. (2003). Troca rápida de ferramentas: proposta metodológica e estudo de caso. Gestão e Produção, 10, 2, 163-181.
Gaither, N. & Frazier, G. (2004). Administração da produção e operações (8ª ed.). São Paulo: Pioneira Thomson Learning.
Galliano, A. G. O. (1979). Método científico: teoria e prática. São Paulo: Habra.
Gil, A.C. (2007). Como elaborar projetos de pesquisa (4a ed.). São Paulo: Atlas.
Goldratt, E. M. & Cox, J. (1998). A Meta: um processo de melhoria contínua (2a ed.). São Paulo: Nobel.
Goss R., Maxim, C., Adhukari, D. & Rothe, J. (2010). Leveraging new SEMI standard to reduce waste and improve flow for semiconductor manufacturing. Robotics and Computer Integrated Manufacturing, 26, 658–664.
Hansen, R.C. (2006). Eficiência Global dos Equipamentos – uma poderosa ferramenta de produção/manutenção para o aumento dos lucros. Porto Alegre: Bookman.
Harry, M. & Schooeder, R. (2000). Six Sigma: The Breakthrough Management Strategy Revolutionalizing the World’s Top Corporations. New York: Currency/Doubleday.
Lakatos, E. M. & Marconi, M. A. (2001). Fundamentos metodologia científica (4a ed.) São Paulo: Atlas.
Maestrelli, N. (2014). Redução de tempos de preparação de máquinas (setup): um caso de aplicação. Revista Manufatura em foco, 12, 8-11.
Mardegan, R., Lopes, P., Tresiane, R.B., Guerra, M. & Rocha, F. (2006, outubro). Estudo de caso de implementação de troca rápida de ferramenta em uma empresa metal mecânica. Anais do Encontro Nacional de Engenharia de Produção. Fortaleza, CE, Brasil, 35.
Méndez, J. D. M. & Rodríguez, R. S. (2015). Set-up reduction in an interconnection axle manufacturing cell using SMED. The International Journal of Advanced Manufacturing Technology. 84, 1907–1916.
Mccarthy, R. (2006). Toolroom management: presetting increases profits and productivity. MoldMaking Technology, 2006.
Mcintosh, R. I., Sugai M. & Novaski, O. (2007). Metodologia de Shigeo Shingo (SMED): análise crítica e estudo de caso. Revista Gestão e Produção, 14, 2, 323-335.
Mello, C. H. P., Turrioni J. B., Xavier, A.F. & Campos, D.F. (2012). Pesquisa-ação na engenharia de produção: proposta de estruturação para sua condução. Produção, 22, 1, 1-13.
Monden, Y. (1984). Produção sem estoques: uma abordagem prática ao sistema de produção da Toyota. São Paulo: Iman.
Moxhan, C. & Greatbanks, R. (2001). Prerequisites for the implementation of the SMED methodology. A study in the textile-processing environment. The International Journal of Quality & Reliabilty Management, 18, 45, 404-414.
Nicholas, J. (1998). Competitive manufacturing management Irwin. McGraw-Hill: International Edition
Polit, D. F., Beck, C. T. & Hungler, B. P. (2004). Fundamentos de pesquisa em enfermagem: métodos, avaliação e utilização (5a ed.). Porto Alegre: Artmed.
Satolo, E. G. & Calarge, F. A. (2008). Troca Rápida de Ferramentas: estudo de casos em diferentes segmentos industriais. Exacta, 6, 2, 283-296.
Shingo, S. (1985). A revolution in manufacturing: the SMED system. Cambrigde: Product Press.
Shingo, S (2000). Sistema de Troca Rápida de Ferramenta: uma revolução nos sistemas produtivos. Porto Alegre: Bookman.
Strapasson, M., & Leite, H. V. R. (2012, outubro). Troca rápida de ferramenta: estudo de caso em uma indústria do setor metal mecânico. Anais do Encontro Nacional de Engenharia de Produção. Bento Gonçalves, RS, Brasil, 32.
Thiollent, M. J. M. (2011). Metodologia da pesquisa-ação (18a ed.) São Paulo: Cortez.
Usevicius, L. A. (2004). Implantação da metodologia seis sigma e aplicação da técnica estatística projeto de experimentos na resolução de problemas e otimização de processos de fabricação. Dissertação de Mestrado, Universidade Federal do Rio Grande do Sul. Porto Alegre, RS, Brasil.
Van Goubergen, D. (2000). Set-up reduction as an organization-wide problem. Proceedings in Solutions 2000 Conference. Cleveland: DRI Research e Publications.
Vieira Junior, M., Silva, J. M., Correr, I., Coppini N. L. & Baptista, E.A. (2011). Statement of losses caused by the presetting of tools by the manual method. POMS 22nd Annual Conference, Reno, Nevada, U.S.A.
Werkema, C. (2006). Lean Seis Sigmas: introdução às ferramentas do Lean Manufacturing. Belo Horizonte: Werkema Editora.
Wiltsie, J. (2012). Setup reduction-one discipline you must master. Magazine Production Maching.
Xavier, C. A. R. & Carvalho, S.M. (2014). A melhoria do setup de uma empresa de usinagem: um estudo de caso em Porto Velho. Revista Interdisciplinar Científica Aplicada, 8, 2, 12-34.
Zasadzień, B. S., Zasadzień, R. & Kwiecień, A. G. (2018). Improving the efficiency of the production process using SMED. MATEC Web of Conferences, 183.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2021 Exacta
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.