Integrated application of statistical process control and work study in a food industry
DOI:
https://doi.org/10.5585/exactaep.v18n1.10566Keywords:
Time and motion study, Control chart, Loaf bread production.Abstract
This article aims to apply work study and statistical process control in the production line of a factory that produces loaf bread. To reach this objective a mapping of the productive process was necessary through the 5W1H action plan and the flow chart, as well as the timing of the activities and the calculations inherent to the time and motion study and for control charts elaboration. Operator models were selected and trained to eliminate unnecessary movements and to standardize the sequence of operations for purposes of comparison with the times obtained before training. The research evidenced a reduction of approximately 16% in the execution time of the activities, as well as in the reduction of the process variabilities. In this way, it was verified that joint application of tools presented great improvements for the management of the productive process of loaf bread.
Downloads
References
Andrade, P. P., Jr, & Kakuda, S. M. (2013). Controle estatistico em processos industriais. Exatas & Engenharia, 3(05), 22–33.
Barbosa, M. B., & Vieira, F. G. D. (2017). O papel estratégico do departamento de compras em uma organização cooperativa. Caderno de Administração, 14(1), 74–87.
Barnes, R. M. (2004). Estudo de Movimentos e de Tempos: Projeto e Medida do Trabalho. (6o ed) . São Paulo: E. Blucher, Org.
Čampulová, M., Veselík, P., & Michálek, J. (2017). Control chart and Six sigma based algorithms for identification of outliers in experimental data, with an application to particulate matter PM 10. Atmospheric Pollution Research, 8(4), 700–708.
Chang, C.-M., Kao, C.-H., Sha, W.-S., Wu, W.-H., & Chen, J.-C. (2016). Multilevel control chart and fuzzy set theory to monitor inpatient falls. Journal of Business Research, 69(6), 2284–2288.
Cohen, A., Tiplica, T., & Kobi, A. (2016). Design of experiments and statistical process control using wavelets analysis. Control Engineering Practice, 49, 129–138.
Contador, J. C. (2010). Gestão de operações: Engenharia de Produção a serviço da modernização da empresa (3o ed) São Paulo: Editora Blucher.
Costa, A. F. B., Epprecht, E. K., & Carpinetti, L. C. R. (2012). Controle estatístico de qualidade. São Paulo: Atlas.
Dias, V. M., & Nunes, D. M. (2014). Estudo de tempos e movimentos para determinação da capacidade produtiva do processo de carregamento do terminal de transbordo de fertilizantes. e-RAC, 4(1).
Duran, C., Cetindere, A., & Aksu, Y. E. (2015). Productivity Improvement by Work and Time Study Technique for Earth Energy-glass Manufacturing Company. Procedia Economics and Finance, 26(15), 109–113.
Epprecht, E. K., & Leiras, A. (2007). Otimização conjunta de gráficos de X-barra - S ou X-barra - R: um procedimento de fácil implementação. Production, 17(3), 520–535.
Faria, K. B., Santos, A. C. de S. G. dos, Mendonça, L. A., Reis, A. da C., & Salles, S. A. F. (2017). Influencing factors analysis to determine standard time of operators in a gauge calibration process. Independent Journal of Management & Production, 9(5), 589–606.
Garcia, R. . (2010). Estudo de caso de controle estatístico de processo: levantamento estatístico de defeitos em molduras. Monografia. Universidade Estadual Paulista Júlio de Mesquita Filho, Itapeva, SP, Brasil.
Gauniyal, A., Pant, K., & Agarwal, A. (2014). Time study model of a compact fluorescent lamp manufacturer in India: a case study. International Journal of Mechanical Engineering and Robotics Research, 11(1), 154-164.
Gibson, J. W., Clayton, R. W., Deem, J., Einstein, J. E., & Henry, E. L. (2015). Viewing the work of Lillian M. Gilbreth through the lens of critical biography. Journal of Management History, 21(3), 288–308.
Hanamant, K., Tushar, S., Aniket, K., Mahesh, H., & Vinod, M. (2017). Time and Motion Study for Reducing Cycle Time of Planetary Carrier. International Journal for Scientific Research & Development|, 5(04), 321–613.
Kiran, N. V. N. I., Kumar, B. P., & Teja, B. V. R. (2015). Back Propagation Artificial Neural Networks for the Analysis of Control Chart Patterns. International Journal of Engineering and Management Research, 5(2).
Konrath, A. C. (2008). Influência do processo de medição no controle estatístico de processos Tese de Doutorado. Universidade Federal de Santa Catarina, Florianópolis, SC, Brasil.
Martins, P. G., & Laugeni, F. P. (2015). Administração da produção (3o ed). São Paulo: Saraiva.
Moktadir, M. A., Ahmed, S., Tuj Zohra, F., & Sultana, R. (2017). Productivity Improvement by Work Study Technique: A Case on Leather Products Industry of Bangladesh. Industrial Engineering & Management, 06(01), 1-11.
Montgomery, D. C. (2015). Introdução ao controle estatístico da qualidade. Rio de Janeiro: LTC.
Montgomery, D. C., & Runger, G. C. (2016). Estatística Aplicada e Probabilidade Para Engenheiros (6o ed). Grupo Gen.
Moreira, A. D. (2013). Administração da produção e operações (2o ed). São Paulo: Cengage Learning.
Mori, V. V., Kanchava, Y. B., Karetha, P. A., & Charola, M. B. (2015). Productivity Improvement by use of Time Study, Motion Study, Lean Tool’s and Different Strategy for Assembly of Automobile Vehicles. International Journal for Scientific Research & Development|, 3(2), 2321–613.
Nabi, F., Mahmud, R., & Islam, M. (2015). Improving Sewing Section Efficiency through Utilization of Worker Capacity by Time Study Technique. International Journal of Textile Science, 4(1), 1–8.
Nallusamy, S., & Muthamizhmaran, S. (2016). Enhancement of Productivity and Overall Equipment Efficiency Using Time and Motion Study Technique - A Review. Advanced Engineering Forum, 14, 59–66.
Ng, J. J. (2018). Statistical Process Control Chart as a Project Management Tool. IEEE Engineering Management Review, 46(2), 26–28.
Nyau, S. Y., Lee, M. H., & Wong, M. L. D. (2017). Optimal statistical design of variable sample size multivariate exponentially weighted moving average control chart based on median run-length. Quality Technology & Quantitative Management, 14(4), 478–495.
Ochoa, C., Murcia, H., Fucinos, R., & Domínguez, K. (2017). New implementation of Work Sampling Analysis for validating the Present Idle Time Indicator of Maintenance and Ship Repairing Business Line of Cotecmar. Ship Science & Technology, 10(20),9-18.
Parmar, K., Parth, D., & Shingala, prof N. (2016). An optimization of process parameter in crankshaft using with time study method. International Journal of Engineering Development and Research, 4(2), 2321–9939.
Patel, N. (2015). Reduction in product cycle time in bearing manufacturing company. International Journal of Engineering Research and General Science, 3(3), 466-471.
Peinado, J., & Graeml, A. R. (2007). Administração da produção: operações industriais e de serviços. Curitiba: UnicenP.
Pimentel, L., & Barrueto, F. (2015). Statistical Process Control: Separating Signal from Noise in Emergency Department Operations. The Journal of Emergency Medicine, 48(5), 628–638.
Puvanasvaran, A. P., Mei, C. Z., & Alagendran, V. A. (2013). Overall Equipment Efficiency Improvement Using Time Study in an Aerospace Industry. Procedia Engineering The Malaysian International Tribology Conference, 68, 271–277.
Rezende, P. A., Martins, T. L. R., & Rocha, M. F. (2017). Aplicação do estudo de tempos e movimentos no setor administrativo: estudo de caso em uma empresa mineradora. Revista Produção e Engenharia, 8(1), 653–665.
Saibani, N., Muhamed, A. A., Maliami, M. F., & Ahmad, R. (2015). Time and Motion Studies of Manual Harvesting Methods for Oil Palm Fruit Bunches: A Malaysian Case Study. Journal Technology, 74(3), 77–83.
Sancho, J., Pastor, J. J., Martínez, J., & García, M. A. (2013). Evaluation of Harmonic Variability in Electrical Power Systems through Statistical Control of Quality and Functional Data Analysis. Procedia Engineering, 63, 295–302.
Shamsuzzaman, M., Jasim, E., & Alsyouf, I. (2016). Application of statistical process control chart for monitoring electric power losses through transmission and distribution system: A case study. Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management, Detroit, Michigan, USA, 7.
Shewhart, W. A. (1931). Economic control of quality of manufactured product. New York: Van Nostrand.
Slack, N., Chambres, S., & Johnston, R. (2009). Administração da Produção (3o ed). São Paulo: Atlas.
Starovoytova, D. (2017). Time-study of Rotary-Screen-Printing Operation. Industrial Engineering Letters, 7(4), 13.
Sun, J., Peng, Z., Zhou, W., Fuh, J. Y. H., Hong, G. S., & Chiu, A. (2015). A Review on 3D Printing for Customized Food Fabrication. Procedia Manufacturing, 1, 308–319.
Vekariya, A., & Kumar, A. (2014). A Review on Improvement of Workflow and Productivity through Application of Time and Motion Study Technique. International Journal for Scientific Research & Development, 2(10), 4.
Vieira, S. (2014). Estatística para qualidade (3o ed). Rio de Janeiro: Elsevier.
Weise, A. D., Bolsson, D., Medeiros, F. S. B., & Boligon, J. A. R. (2013). Um estudo sobre o tempo-padrão no processo produtivo de recapagem de pneus em uma concessionária de veículos. Revista Gestão e Desenvolvimento, 10(1), 113-124.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2020 Exacta
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
- Abstract 1040
- pdf (Português (Brasil)) 1011