Analysis of Time Management Applied to a Project of Oil
DOI:
https://doi.org/10.5585/gep.v1i2.19Keywords:
Time Management, Gantt, DelaysAbstract
Project management (PM) efficient results in increased probability of success of activities and itscompletion as time, cost and scope planned. Since this triad (time, cost and scope) is connected, anychanges will affect within the scope and increase the cost of the project. This was a case study in alarge company exploiting oil and gas. The research is focused on time management (TM) in an oilproject in order to examine the schedule of activities according to the time tool, the Gantt Chart inMS Project 2003 software. The study design was selected due to its long delay in implementationand lack of planning and managing this. By analyzing the Gantt Chart, activities were identifiedlate. With this, the problems that caused delays were surveyed (the project documents) and theirparents questioned. Thus, it was proposed improvements to an effective control of time on theproblems encountered.References
Gaither, N. e Frazier, G. (2002). Administração da produção e operações. (cap. 18). São Paulo: Pioneira Thomson Learning.
Marques, L. S. (2009). A importância do gerenciamento do tempo nos projetos. Recuperado em 28 abril, 2009, de <http://www.ietec.com.br/site/techoje/categoria/detalhe_artigo/409>.
Pinto, A. (2009). Relatório principal do estudo de benchmarking: gerenciamento de projetos Brasil. Biblioteca do site da Manager Brazil: Consultoria e Treinamento em Projetos. Recuperado em 12 abril, 2010, de < http://www.managerbrazil.com.br/biblioteca/BenchmarkingGP2009.pdf>.
PMI - Project Management Institute. (2004). Um guia do conjunto de conhecimentos em gerenciamento de projetos. (3a. ed., pp. 123-156).
Newtown Square, PA, EUA: Project Management Institute.
Pons, R. (2009). Fundamentos em gerenciamento de projetos: módulo básico do curso de formação em gerenciamento de projetos. [Apostila de aula]. Rio de Janeiro: Projectlab.
Silveira, J. G. (2008, março). Gerenciando projetos com Primavera Enterprise 6. Anais do Primeiro Evento Técnico, PMI-MG, Belo Horizonte, MG, Brasil, 31. Recuperado em 30 outubro, 2009, de <http://www.pmimg.org.br/downloads/EventoTecnico-31mar07_GerenciandoProjetosIntegrandoPessoasProcessosTecnologia_JoyceSilveira.pdf>.
Slack, N.; Chambers, S. e Johnston, R. (2002). Administração da produção. (2a. ed., cap.10 e 16). São Paulo: Editora Atlas S.A.
Valeriano, D. L. (1998). Gerência em projetos: pesquisa, desenvolvimento e engenharia. São Paulo: Makron Books.